Drywall follows whatever is behind it. A stud that bows out a quarter inch becomes a hump in the finished wall, and no amount of joint compound will hide it under the right light. The time to find those problems is before the first sheet goes up.
Start with plane. Hold a long straightedge across the studs on every wall and across the ceiling joists. Crowned or twisted studs should be planed, shimmed, or replaced. Pay extra attention to long walls, kitchen walls where cabinets and counters will show every wave, and any wall that will have light running down its length.
Then check backing. Every inside corner, every ceiling edge, and every board end needs something solid to fasten to. Add blocking now for anything heavy that will hang on the wall later: cabinets, a wall-mounted TV, grab bars, shelving, a barn-door track. It takes minutes at this stage and a torn-open wall afterward.
Last, confirm that everything inside the wall is finished and inspected. Plumbing, electrical, low-voltage wiring, ductwork, and insulation all need to be complete, and protective plates should cover any pipe or wire that passes close to the face of a stud. Take photos of every wall before it's covered. Years from now, when you need to find a pipe or a stud, you'll be glad you did.
